Centrifuge Foundation Plinth located in Port Kembla, NSW

Project Details:

The demolition of the centrifuge foundation involved the removal of the two twelve ton centrifuges and associated plant, demolition of the 450 ton concrete plinth and the recycling of all concrete materials to be reused onsite. It was necessary to evacuate the water plant control room for the duration of the project. care was taken to ensure no damage occurred to the housing structure which was required to remain for future site use.