Boral Concrete Batching Plant located in Moorebank, NSW

Project Details:

The demolition of the Boral Moorebank batching plant involved the partial dismantling and relocation of the overhead bin structure, hazard removal, demolition of all remaining structures. The removal of the 3000 cubic meter ground bin ramp, involved the removal of 1800 cubic meters of contaminated soils. All pits and sumps were required to be back filled and compacted leaving the site ready for future use or sale.