The explosive demolition of the steel boiler house and office annex being approximately 55m in height, using linear cutting charges to fell the structures. The site electrical switch yard was located 120m from the structures in the felling direction, protection measures used were shipping container wall to ensure no damage to the switch yard occurred during the demolition.